Operator's Manual: Models CB-3500 & CB-5000
9-5
Cleaning the Check Valve
This procedure applies to furnace installations with inside and outside tanks. The following protective gear
should be worn when cleaning the check valve/screen:
Rubber gloves
Safety goggles
1. Refer to Figure 9D. Remove the one-piece suction oil line from the tank.
2. Remove the check valve and lter. Clean these components in a parts washer.
3. Check the operation of the check valve. The valve must seat so it is airtight to hold pump prime.
4. Re-assemble and re-install the components. Apply Permatex #2 non-hardening gasket sealer or
equivalent to the threaded ttings. Firmly tighten all connections so the suction line is 100%
airtight.
5. Follow pump priming instructions in Section 5 to re-establish prime.
Figure 9D - Check Valve Detail
SUCTION
OIL LINE
VENT
CAP
OIL STORAGE TANK
EMERGENCY
VENT
METERING PUMP
CHECK VALVE
CHECK VALVE SCREEN
TO BURNER
FUNNEL WITH
BALL VALVE
CLEANOUT
I88670-F
12"
Vue de la page 88